Transactions of KarRC RAS :: Scientific publications
Transactions of KarRC RAS :: Scientific publications

Transactions of KarRC RAS :: Scientific publications
Karelian Research Centre of RAS
ISSN (print): 1997-3217
ISSN (online): 2312-4504
Transactions of KarRC RAS :: Scientific publications
Background Editorial committee Editorial Office For authors For reviewer Russian version
Transactions of KarRC RAS :: Scientific publications

Electronic Journal OJS



Series

Biogeography

Experimental Biology

Mathematical Modeling and Information Technologies

Precambrian Geology

Ecological Studies

Limnology and Oceanology

Research in the Humanities (2010-2015)

Region: Economy and Management (2012-2015)



Issues

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

1999-2008




SCIENTIFIC PUBLICATIONS
И.В. Мелик-Гайказов, Т.А. Ковырзина, Ф.Д. Ларичкин, В.И. Белобородов, В.Н. Переин.
Экономическая эффективность утилизации отходов обогащения и подготовки резервной сырьевой базы предприятия
// Труды КарНЦ РАН. No 6. Сер. Регион: экономика и управление. 2012. C. 172-181
I.V. Melik-Gaikazov, T.A. Kovyrzina, F.D. Larichkin, V.I. Beloborodov, V.N. Perein. Economic efficiency of ore processing waste recycling and preparation of raw material reserves of an enterprise // Transactions of Karelian Research Centre of Russian Academy of Science. No 6. Region: Economy and Management. 2012. Pp. 172-181
Keywords: geological prospecting, concentration wastes, combined processing, economy of waste recycling, raw material reserves
We analyse the technical and economic indicators and the efficiency of extraction and processing of concentration wastes from the 1st field of the tailings dump of OJSC “Kovdorskiy Mining and Processing Plant”. On the basis of the experience of geological prospecting at an operating tailings dump, elaboration of an integrated processing technology yielding standard iron ore, apatite and baddeleyite concentrates a technical-economic estimation of the efficiency of recycling poorer tailings from the 2nd field of the dump was carried out. As a result, an additional long-term raw material pool in the form of a man-made deposit of over 115 mln tons was prepared for the company, and inferred relatively richer resources of 78.5 mln tons were estimated to be available in the sump pond area inaccessible for geological prospecting.

trudy_2012_6__172.pdf (175 Kb, total downloads: 449)



  Last modified: July 6, 2013